
Complete basement finishing
Framing, insulation, drywall, flooring, lighting and trim. Walls taped and left paint-ready, or fully painted.
Make more room in the home you already have. Family rooms, bedrooms, bathrooms and legal basement apartments, with the drawings and the Town of Georgina permit handled for you.
Rough budgets before HST. The real number comes after a site visit and drawings. Small basements cost more per square foot, and underpinning is priced separately. See the full cost guide.

Georgina allows up to 2 extra units on a residential lot, as long as the unit meets zoning and the Building Code. A house with a basement apartment needs 3 parking spaces, only 1 of them in the garage, and the unit has to be registered with the Town. Whether your house qualifies depends on the property.
Yes. Here is what the Town asks for and what changes on septic or lakeside lots. Read the full permit guide.
Finishing a basement, turning a room into a bedroom, and adding or moving plumbing. Painting and swapping cupboards with no plumbing don't need one.
Existing and new floor plans with rooms, closets and plumbing fixtures marked, plus a site plan showing the well, septic and driveway.
Through the Town's online portal. Zoning check first, which the Town aims to answer in 5 business days, then a 10 business day review for a house.
Adding a bedroom or bathroom means the Town checks the septic is big enough. A house on septic may not be allowed a basement apartment unless it can take the extra load.
Lots in the conservation authority's regulated area need its approval. Foundation damp-proofing and new weeping tile need their own permit.
Nothing gets covered until the inspector passes it. Electrical permits go through the Electrical Safety Authority.
Basement finishing, bathrooms, bedrooms and legal basement apartments across the Town of Georgina.
The largest community in Georgina, on Cook's Bay.
On the Black River, north of Keswick.
On the Lake Simcoe shore, next to Sutton.
In the east end of Georgina, near the Durham Region line.
Yes. The Town of Georgina lists finishing a basement and adding a bedroom or plumbing as work that needs a building permit. We draw it and apply for you.
As a rough budget, $80 to $120 per sq ft before HST for a basement that isn't a second unit. The real number comes after a site visit and drawings.
The Town aims to answer the zoning check in 5 business days, then has 10 business days to review a complete house permit. Comments from the Town add time.
It depends on the property. Georgina allows up to 2 extra units on a residential lot. You need 3 parking spaces, and a house on septic needs a system that can take the extra load.
The Town covers 50% of eligible costs, up to $30,000 for a new unit or $15,000 to fix up an existing one, while funding lasts. Apply before work starts.
Existing and new floor plans with the rooms, closets and plumbing fixtures marked, plus a site plan showing the well, septic and driveway.
Yes. When you add a bedroom or bathroom, the Town checks the septic system is big enough for it.
A site visit shows what your space can hold and what the Town will ask for.